Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Ratification Package 

: Project repo
: Plan doc
: Status chklist

extensions included


Task group approved by TSC date or Fast Track approved by AR dateSpecification State****ISA AR State++Fast TrackPriv / UnprivCommittee (Owner)Task GroupPlan Milestone Target DateFreeze Milestone Target DateRatification Milestone Target DatePlan
Milestone Next Step*
Freeze
Milestone Next Step**
Ratification
Milestone Next Step***
Last UpdatedNotesIn RVA2023 profile as mandatory or supported optionalMigrated to Jira?

Jira Link

Anchor
ABH_Row
ABH_Row
Byte and Half-word Atomics

Zabha

 

Stable

Approved

(10/10/23)

YU

Unpriv IC
(Ved)

N/AQ4'23Q4'23       Q1'25completeacceptance criteria completeStart

 

AR approved.
Jira Link

Anchor
BFloat16_Row
BFloat16_Row
Bfloat16


 

Zfbfmin, Zvfbfmin, Zvfbfwma
FrozenPublic Review Started

Approved

(7/15/23)

YU

Unpriv IC

(Ken Dockser)
N/AN/AQ2'23
N/Acompletepublic review complete

 



Jira Link

Anchor
CMQRI_Row
CMQRI_Row
Capacity and Bandwidth Controller QoS Register Interface (CBQRI)


  

Ssqosid

 

Plan CompleteQueuedNP

SOC Infrastructure HC (Eric Shiu, Ambika Krishnamoorthy)

CBQRI4Q'22Q2'23Q3'23completeAR approval

 

Submitted to AR
Jira link
Anchor
CTR_Row
CTR_Row
Control Transfer Records

  

Smctr, Ssctr

 

Plan CompleteDevelopmentNP

Priv IC

(Beeman Strong)

CTR TGQ2'23Q3'23Q4'23completeacceptance criteria complete



Jira link

Anchor
Debug_Row
Debug_Row
Debug


  

Sdext, Sdtrig2020Plan CompleteDevelopment

N

PPriv IC
(Tim Newsome)
Debug TGQ1'23Q2'23Q3'23complete

acceptance criteria complete

start

Waiver vote for SAIL and ACT

nJira link

Anchor
FastInt_Row
FastInt_Row
Fast Interrupt 


  

Smclic, Ssclic, Suclic, Smclicshv, Smclicconfig2020Plan CompleteDevelopmentNPPriv IC
(Dan Smathers)
Fast InterruptsN/AQ3'23
N/A

spec development - stable

start


nJira link

Anchor
CSRIndir_Row
CSRIndir_Row
Indirect CSR Access


Smcsrind, Sscsrind
FrozenPublic Review StartedApprovedYPPriv IC
(Beeman Strong)
N/AQ3'23

completecomplete

send out for public review complete



Jira link

Anchor
Zjid_Row
Zjid_Row
Instruction/Data Consistency


Zjid2020StableDevelopmentNPPriv IC
(Martin Maas)
I/D ConsistencyN/AQ2'23
N/A - GrandfatheredAR approvalstart

Spec in slide form, needs to be translated into write-up.

?Jira link

Anchor
Zimop_Row
Zimop_Row
"May Be Ops" (for CFI, etc.) 


Zimop, Zcmop

 

FrozenPublic Review CompleteDevelopmentYUUnpriv IC
(Andrew Waterman/Ved Shanbhogue)
N/AN/AQ2'23
N/A

complete

send out for public review

acceptance criteria complete

  • Andrew working with Ved and ARC on new design
  • Potential ABI impacts identified by ARC.


    nJira Link

    Anchor
    PackedSIMD_Row
    PackedSIMD_Row
    Packed SIMD 


    Zbpbo, Zpn, Zpsfoperand, P

    2020

    NewDevelopmentNUUnpriv IC
    (Kevin Chen)
    Packed SIMDQ3'23Q4'23Q4'23start

    start


    start

    Need plan from Kevin ChennJira Link

    Anchor
    PointerMasking_Row
    PointerMasking_Row
    Pointer masking


     

    Ssnjpm, Smnjpm, Smmjpm2020StableReworkingNPPriv IC
    (Martin Maas)
    Pointer MaskingQ1'23Q2'23
    completeAR approvalstart

    Ongoing discussion with ARC around design.?Jira Link

    Anchor
    Priv1_13_Row
    Priv1_13_Row
    Priv 1.13


      



    NewDevelopmentNPPriv IC
    (TBD)




    build plan

    Awaiting guidance from Greg and Andrew.yJira Link

    Anchor
    Smrnmi_Row
    Smrnmi_Row
    Resumable Non-maskable Interrupts 


    Smrnmi

     

    Plan  CompleteReviewingYPPriv IC
    (Andrew Waterman)
    N/AN/AQ1'23
    N/Aacceptance criteria completestart

    Status checklist reviewed by Philipp.  Work needed.  Requested owner from Greg and Andrew (Priv IC).nJira Link

    Anchor
    SSLP_Row
    SSLP_Row
    Shadow Stacks and Landing Pads


    Zicfiss, Zicfilp


     

    Plan  CompleteQueuedN U + P

    Unpriv IC + Priv IC

    (George, Ved)

    SS-LP-CFI Q4'22Q3'23Q3'23CompleteAR approvalstart

    Submitted to ARnJira Link

    Anchor
    Sscdeleg_Row
    Sscdeleg_Row
    Supervisor Counter Delegation


     

    Smcdeleg, Ssccfg

     

    StableQueuedYPPriv IC
    (Beeman Strong)
    N/A
    (Fast Track)
    Q1'23Q2'23Q3'23Complete

     

    • Needs TSC notification of Plan Milestone
    • Submitted to AR

    Jira Link

    Anchor
    SmMTT_Row
    SmMTT_Row
    Supervisor Memory Tracking Table (SmMTT)


    Smsdid, Smmtt, Svpams, Smsdia

    Plan CompleteDevelopmentNPPriv IC
    (Ravi Sahita)

    SmMTT

    Q3'23Q4'23Q2'23

    Complete

    acceptance criteria complete



    Jira Link

    Anchor
    SPMP_Row
    SPMP_Row
    S-mode PMP


    Sspmp

     

    Plan  CompleteDevelopmentNPSecurity HC
    (Dong Du)
    S-Mode Physical Memory ProtectionQ1'23Q3'23Q4'23CompleteStartN/A

    Plan Milestone review 2/15nJira Link

    Anchor
    VCAllRounds_Row
    VCAllRounds_Row
    Vector Crypto - all-rounds AES


      

    Zvknf

     

    StableDevelopmentNU

    Unpriv IC
    (TBD)

    Cryptographic Extensions3Q'22TBDYE2024CompleteAR Approvalstart

    No owner to drive work.nJira Link

    ...